The objective is: 
243590
The running time is: 
42.3831
The time meeting best is: 
42.3828
Location: 2(load: 524) 
 Route 0(load: 70) 52 3 27 41 24 
 Route 1(load: 66) 36 4 44 28 
 Route 2(load: 65) 14 10 18 5 
 Route 3(load: 61) 47 45 39 30 
 Route 4(load: 69) 74 95 70 51 
 Route 5(load: 66) 53 79 90 73 58 
 Route 6(load: 64) 57 76 68 61 
 Route 7(load: 63) 65 83 97 91 
Location: 4(load: 477) 
 Route 0(load: 70) 50 77 85 78 86 
 Route 1(load: 68) 87 54 56 63 99 
 Route 2(load: 66) 66 55 81 98 96 
 Route 3(load: 67) 71 62 59 69 
 Route 4(load: 69) 60 64 72 93 
 Route 5(load: 70) 82 80 67 75 92 
 Route 6(load: 67) 88 94 89 84 
Location: 5(load: 535) 
 Route 0(load: 62) 17 0 40 34 
 Route 1(load: 68) 13 37 2 1 
 Route 2(load: 70) 48 25 6 33 29 
 Route 3(load: 70) 11 8 42 7 26 
 Route 4(load: 61) 9 32 16 22 
 Route 5(load: 70) 31 12 19 46 
 Route 6(load: 68) 15 38 23 35 
 Route 7(load: 66) 43 20 21 49 
The actual cost is 243590